JR & Rhonda Steinbach Pyramid-Home
Bill's Cycle
Hey.. You found the hidden page.. This page i set up for friends of ours.. Rhonda & I have all kinds of pictures of progress on our house..etc.. of course our 2 maltese maniacs etc.. So, if you know the names of our two dogs, Welcome!!

Rhonda & JR
Snow Bunny & Ice Man at Art & Soul
Ken & JR waiting for track time..
Here is where the house is supposed to go..
I measure where the house goes & Vegas supervises..
Digging the foundation..
Snow Bunny & Ice Man at Art & Soul
Dad's fancy tool..
Can you tell who worked & who was the supervisor?
C-base & A-Base
Doesn't look like 5 grand worth of animals..
Doesn't look like 5 grand worth of gravel..
Archeologist at work, with supervisor..
69
69
69
69
Well diggers
69
69
69
69
69
69
69
69
69
69
69
69
69
69
69
69
The other woman in my life.. Who can't love Peach??
Rhonda w/Patti Cake..
chic with optional stud shown..
stud drives motorcycle.. whats not to like..
Steel for the house is under fabrication..
Finally the main slab is complete..
69
69
Steel
Drilling for all concrete bolts..
The steel finally arrives..
69
The very first beam goes up..
Am i nuts?
69
..
69
69
I used a forklift to lift all but a couple beams..
Discussing the work with my supervisors.
coolest thing i've done..
69
69
Takin the super for a ride..
Back to work..
The view from near the top of the backyard
69
This is what i see from the lake
Junk display
69
Rhonda's car near her Las Vegas property..
Shopping at CHANEL at the Bellagio.. with Peach
Do what?
dope
Valet lost her Nissan..
We are What?
You said this was a Wendy's drive thru..
Gunpowder tool
mmmmmmmm
Vegas trip over.. back to work
69
69
69
69
69
license & registration please
69
69
69
hot..
69
69
69
69
69
cute couple eh?
69
69
69
69
This is what i was doing for hundreds of hours.. damn webpage
69
Race at Brainerd
F1 race was super hot..
NEW TOYOTA ARRIVES!!
Have Hot-Dogs will travel..
The wife with some dude..
nice eyes, babe..
Installing the hitch..
FJ
FJ
yeah
(P&R)=C* (Peach & Rhonda = cute squared)
The Christmas Photo..
cute again
ditto
Look at the wild animal behind me, about to attack..
plywood windows in the backround..
Do these pants make me look fat?
Where are the camels?..
51..
69
69
This is looking up inside.. The red primer will soon be black, which is the finished look.. Cool
Some of the steel engineering..
These plans were altered somewhat, the front door is wider and i changed the beams from 13 to 12 per side, not that i'm superstitous, i just like even numbers...
Also changed to Parallams for the second floor beams, instead of steel..
After a long winter, its time to start on my project again..
51..
51..
just bootin around in the lift..
steel garage door in progress..
steel garage door in progress..
steel garage door in progress..
placed, but more work than it looks..
packing in the insulation..
51..
51..
Blueskin layer is finally completed..
Cute fogwalking pajama pants ..
Drinkin, Drivin with one hand, while being chased by a vicious Maltese..
This is the coolest lil guy i've ever known..
What?..
if he could, he would..
Chatty bunch..
Professional painter at work..
Rhonda with Fox painting gloves, at 28 feet up..
Starting on the westside on Canada Day..
Starting finally on the insulation..
Check out my fancy angled insulation cutting jig ..
Westside insulation going on..
Starting the exterior black steel..
cool..
doesnt look it, but its desert hot out..
cool..
the easiest of four sides..
51..
Can you spot the door?..
51..
51..
51..
51..
51..
black..
part 1..
part 2..
part 3..
part 4..
part 5..
all i need now are the hydraulics ..
51..
51..
in house robot..
time to figure out the glazing frames..
950 lbs of window frames..
prepping window frames..
Highest piece, first window ..
Plus 35 and this nut's wearing black pants?..
somehow, it fit's..
32 feet up and exact on frames that were put up the winter before..
old man soaking western style..
P loves V..
starting on the second and biggest of four assemblies..
hot hot hot ..
soo damn hot....
nearly melting ..
i sold my bike to someone in Quebec..
frames in, next the glass ..
east side then ..
51 ..
51 ..
51 ..
Snow is coming , gotta hurry ..
RA looks on ..
Notice no glass yet, then the 375,000 btu heater? Starting to get cold at night..
The first shipment of glass arrives..
151 lbs per unit..
Off comes the plywood, time to install glass and end the darkness..
Tryin to figure out how to get the JLG to do all the heavy lifting..
I have two suction cups holding up the glass, i'm REALLY hoping they stay working ..
Man, do i want this to work like i planned..
One hand barely balancing the glass in the wind, one hand steering the lift with the controls loose on the basket floor, with an untested installation method planned, 30 feet up..
This is some fun!..
Now i gotta make sure the glass edges don't strike the metal frame, with about a 1/4" of clearance ..
Second unit was just as fun ..
Three in, 25 to go.. Beats the plywood look so far..
Those suction cups really suck ..
51 ..
Working till dark daily..
51 ..
Purple flower, chimney sticking out and Vegas sniffing for intruders.. Notice all the leaves on the ground, and i only have half the windows in..
Workin late ..
The next day we woke up to snow ..
51 ..
51 ..
51 ..
Snow, but no windows..
we live here..
The last window ..
time to visit Grandma... people seem to love her....
How the hell ? ..
this should work ..
need heat..
Hangin out with Peach..
Me and my angry lil buddy..
us ...
VEGAS ...
click the blue to see more ...
My buddy VEGAS..... a better freind was never had.... i miss him beyond explanation... He gave the word "cool", meaning.. Few people i've met, have.


Bill's Cycle